Descargar Imprimir esta página

Salicru EQUINOX EQX2 3002-SX Manual De Usuario página 46

Inversores solares monofásicos de conexión a red
Ocultar thumbs Ver también para EQUINOX EQX2 3002-SX:

Publicidad

Idiomas disponibles

Idiomas disponibles

2.3.1. Explanation of the symbols.
This chapter explains the symbols that appear on the inverter, label
and packaging.
2.3.1.1. Symbols on the inverter.
Inverter status indicator.
Inverter operation indicator.
Earthing connection symbol, the inverter housing must be
properly earthed.
Tab. 2. Inverter symbols.
2.3.1.2. Inverter label symbols.
The inverter may not be disposed of with household waste.
Please read the instructions carefully before installation.
Do not touch any internal part of the inverter for 5 minutes
after it has been disconnected from the grid and from the
photovoltaic input.
CE marking, the inverter meets the requirements of the
applicable CE directives.
SGS certification.
TÜV certification.
Danger.Risk of electric shock.
Do not touch. Hot surface during operation.
Danger of electric shock, live parts, risk of electric shock,
do not touch.
Tab. 3. Labelling symbols.
2.3.1.3. Packaging symbols.
Handle with care.
Indicator of the correct direction of the packaging.
Earthing connection symbol, the inverter housing must be
properly earthed.
6
Stacked layers 6.
46
SALICRU

Publicidad

loading