Pentair ICHLOR Guia De Instalacion página 182

Ocultar thumbs Ver también para ICHLOR:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 82
Mounting the Power Center Enclosure
1. Remove the screw securing the Power Center cover and remove the cover.
2. Mount the Power Center on a flat surface such as a wall or post and mark each mounting bracket screw hole location.
There are two (2) screw holes and a key slot for the top and lower bracket.
3. Drill 6 holes of 6mm (¼ inch) . Install anchors if necessary and one screw for each bracket key slot location.
4. Position each Power Center key slot (top and lower) over the two mounting screws just installed. Tighten the two screws
to secure the enclosure.
5. Install and tighten four mounting screws (two in the top and two in the lower bracket).
Bracket screw hole
Cover screw hole
Bracket screw hole
Connecting the iCHLOR Cell Cable to the Power Center
Connect the iCHLOR cell power cable to the power center as follows:
1. IMPORTANT WARNING: Be sure that the Power Center AC power line is switched OFF before connecting the power
cord connector to the Power Center.
2. Align the iCHLOR cell power cord connector with the socket on the bottom of the Power Center and insert the connector.
Rotate the round socket nut until it locks the connector in place.
Bracket key slot
Bracket key slot
6
Bracket screw hole
Bracket screw hole
Connector Socket Nut
To iCHLOR Cell

Hide quick links:

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ichlor salt chlorinator

Tabla de contenido