Descargar Imprimir esta página

YEAZ SUP Board Manual Del Usuario página 17

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 36
USAGE
Please do not use sharp items!
UNFOLDING THE BOARD
Find a smooth and clean surface to unfold the hose body.
For initial inflation and to familiarise yourself with your new product, we
recommend that you inflate it at room temperature. The PVC material is
soft, which makes it easy to install. If the paddleboard has been stored at a
temperature below 0°C, keep it at 20°C for 12 hours before unfolding.
OPERATING THE VALVE
To inflate the board, please remove the safety cap of the valve. Turn it
counterclockwise to inflate the board. The valve is opened (when deflating
at the bottom) or closed (when inflating at the top) by a spring loaded insert.
Before you start inflating, please make sure that the valve core needle is in
the „upper" position. If the needle is in the „down" position, press the valve
core needle and turn it clockwise or counterclockwise until it pops up.
17

Publicidad

loading

Productos relacionados para YEAZ SUP Board