Descargar Imprimir esta página

CAMBRIDGE Pre-Packaged Olde English Paver Manual De Instrucciones página 50

Publicidad

Olde English Paver Fireplace Kit Deluxe Surround
Layer 32:
Once the chimney has been centered, take the
chase flashing with the collar up and slide it
onto the termination cap sleeve until it is flush
with the bottom of the termination cap. (See
photo top left) See picture detail of how the
termination cap chase flashing and chimney
section should line up inside the block chimney
cavity. (See photo top right) Take the entire
assembly to the top of the fireplace chimney,
carefully slide the termination cap sleeve into
the chimney section while rotating left to right
so the sections line up and sleeve together.
Cambridge Pre-Packaged
50
Capa 32:
Una vez que se ha centrado la chimenea tome la
persecuci n que destella con el collar para arriba
y deslícela encendido hacia la manga del casquillo
de la terminacion hasta que sea rasante con la
parte inferior del casquillo de la terminaci n.
(Véase la foto inferior) Represente el detalle de c
mo el destellar de la persecucion del casquillo de
la terminacion y la seccion de la chimenea deben
alinearse dentro de la cavidad de la chimenea del
bloque. (Véase la foto abajo a la derecha) Lleve a
la asamblea entera a la tapa de la chimenea, res-
bale cuidadosamente la manga del casquillo de la
terminacion dentro de la secci n de la chimenea
mientras que la rotaci n de izquierda a derecha las
secciones se alinea y envuelve tan junta.
2015

Publicidad

loading