dirna Bergstrom bycool Dinamic 1.1 24 V Instrucciones De Montaje página 19

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

DINAMIC 1.1
PRIOR OPERATIONS:
• Disconnect the battery.
• Dismount the evaporation unit cover.
CABIN INTERIOR:
1
Introduce the template supplied and mark
bores.
A- If there are 2 beds, place the template
between the two.
B- If there is 1 bed, place the template on the
bed.
Make through bore Ø4 with long broach in bore
2
position Ø48, and then make the following
bores.
A- make (1) Ø35 in the cover only
B- make (1) Ø19 in the cover only
C- make (1) Ø48 in the cover only
D- make (4) Ø22 in the cover only
Air conditioning for vehicles
UP
1
UP
2D
19
EN
UP
Ø48
Ø35
Ø19
UP
Ø48
2
Ø35
Ø19
2C
2D
2A
2B

Publicidad

Tabla de contenido
loading

Tabla de contenido