DINAMIC 1.1
EN
GAS LOAD:
Empty the circuit for at least 30 minutes.
15
Introduce 300 g of gas load R134a and start
16
up the equipment.
GENERAL VIEW OF THE CONDENSATION
17
UNIT AND PIPING.
GENERAL VIEW OF THE EVAPORATION
18
UNIT.
32
Air conditioning for vehicles