Assembly And Operation; Applications; Prior To Operation - Hitachi Koki P 20SB Manual De Instrucciones E Instrucciones De Seguridad

Ocultar thumbs Ver también para P 20SB:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

English

ASSEMBLY AND OPERATION

APPLICATIONS

Planing various wooden planks and panels
Fig. 2-A (Planing)
15/64"(Max)
(6mm)
Fig. 2-D (Tapering)

PRIOR TO OPERATION

1. Power source
Ensure that the power source to be utilized conforms to the power source requirements
specified on the product nameplate.
2. Power switch
Ensure that the switch is in the OFF position. If the plug is connected to a receptacle
while the switch is in the ON position, the power tool will start operating immediately
and can cause serious injury.
3. Extension cord
When the work area is far away from the power source, use an extension cord of
sufficient thickness and rated capacity. The extension cord should be kept as short as
practicable.
10
15/32"(Max)
(12mm)
15/32"(Max)
(12mm)
Fig. 2-B (Beveling)
Fig. 2-E (Side planing of flush door)
15/64"(Max)
(6mm)
Fig. 2-C (Rabbeting)
Side face cutting

Publicidad

Tabla de contenido
loading

Tabla de contenido