Step 7, Install Hood; Step 8, Connect Electrical; Step 9, Slide Duct Cover Down, Install Side Utensil Rods - GE Monogram ZV850 Instrucciones De Instalación

Ocultar thumbs Ver también para Monogram ZV850:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

7 INSTALL HOOD
NOTE: Before installing the hood, the metal damper
flaps on top of the hood exhaust outlet may be removed.
Do not remove the duct transition. The damper is not
required for this recirculating operation.
NOTE: TWO PEOPLE ARE REQUIRED TO COMPLETE
THIS INSTALLATION!
the hood mounting studs into the support frame holes,
and at the same time, guide the hood duct connector
into the duct.
CONNECT ELECTRICAL
Verify that power is turned off at the source.
WARNING:
with a ground wire, a ground must be provided
by the installer. When house wiring is aluminum,
and aluminum-to-copper connectors.
box cover.
or bare ground lead.
electrical connector.
Be sure wires are not pinched.
Installation Instructions
INSTALLATION – RECIRCULATING
If house wiring is not 2-wire
Install 4 nuts and lock washers. Tighten with a 10 mm
wrench.
Check hood level in both directions.
Seal the duct connection with duct tape.
NOTE: Do not drive screws through this duct
connection. Doing so will prevent proper damper
operation (if present).
9 SLIDE DUCT COVER DOWN,
INSTALL SIDE UTENSIL RODS
stop screw.
of the hood. The duct cover should be seated into
the pocket on top of the hood.
20

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Monogram zv855

Tabla de contenido