REMOVE THE PACKAGING
CAUTION:
against sharp edges.
The vent hood is packed with the duct cover and
support frames.
Remove the hood, parts and packaging.
Remove junction box cover.
Install strain relief onto junction box cover
(not supplied).
NOTE: Additional tools, materials and hardware are
required to construct your ceiling support.
Check Installation Hardware
hood and check contents.
4 Hex-head
wood lag
screws
(6 mm x
2-1/2" or 1/4
x 2-1/2")
(One is in the service
4 (10 mm) Nuts
and lock
washers
2 Utensil rods with 4 machine screws
Installation Preparation
Wear gloves to protect
2 Phillips-head
4 Flat
duct cover
washers
screws
2 Stop screws
manual envelope.
the envelope.)
8 Frame
attachment
screws with
washers (attached
to accessory
support frames)
Support
frames with 8
screws and 8
washers
Front of Hood
Template
Additional Parts for Recirculating Operation
Air deflector with upper
duct connector and 4
small flat-head screws
7
Mounting screw holes
Decorative
duct covers
3 Stainless
steel grease filters
3 Charcoal filters