Remove The Packaging; Check Installation Hardware - GE Monogram ZV850 Instrucciones De Instalación

Ocultar thumbs Ver también para Monogram ZV850:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

REMOVE THE PACKAGING

CAUTION:
against sharp edges.
The vent hood is packed with the duct cover and
support frames.
Remove the hood, parts and packaging.
Remove junction box cover.
Install strain relief onto junction box cover
(not supplied).
NOTE: Additional tools, materials and hardware are
required to construct your ceiling support.

Check Installation Hardware

hood and check contents.
4 Hex-head
wood lag
screws
(6 mm x
2-1/2" or 1/4
x 2-1/2")
(One is in the service
4 (10 mm) Nuts
and lock
washers
2 Utensil rods with 4 machine screws
Installation Preparation
Wear gloves to protect
2 Phillips-head
4 Flat
duct cover
washers
screws
2 Stop screws
manual envelope.
the envelope.)
8 Frame
attachment
screws with
washers (attached
to accessory
support frames)
Support
frames with 8
screws and 8
washers
Front of Hood
Template
Additional Parts for Recirculating Operation
Air deflector with upper
duct connector and 4
small flat-head screws
7
Mounting screw holes
Decorative
duct covers
3 Stainless
steel grease filters
3 Charcoal filters

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Monogram zv855

Tabla de contenido