Descargar Imprimir esta página

Installation Instructions - Becker BOM 650C Manual Del Usuario

Ocultar thumbs Ver también para BOM 650C:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 31

• Installation Instructions

Please read these instructions carefully prior to
installation!
Installation should only be carried out by persons
qualified to do so!
Incorrect installation can put the safety of persons at
risk!
In case of improper installation, the manufacturer's
guarantee becomes void.
Preparing for installation
1.
In order to allow mains connection, a socket
must be available on site - the supplied mains
connecting cable has a length of 80 cm.
2. Check the stability of the door. Retighten the
screws and nuts on the door.
3.
Check if the door is running smoothly. Lubricate
shafts and bearings. Check the petension of the
springs and if necessary re-adjust.
4. Establish the door's highest point of travel (see
figure ).
6
5.
Close the door and disable any existing locks
out of operation, if necessary dismantle.
Parts of latching devices, which could
form pinch or shear points, have to be
dismantled.
6.
For garages without a second entrance, an
emergency release is required (accessory).
7.
If a wicket pass door is included, fit the wicket
door contact.
8.
Insert the light bulb into the operator and fasten
the lamp cover with 2 screws 4.2 x 50.
0
The following tools are required
- Drilling machine with
10 mm masonry drill
4 mm metal drill
- Metal saw
- Spanner, sizes 10, 13 mm
- Slotted screwdriver, width 3 mm
- Phillips screwdriver, size 2 x 100
- Spirit level
Attention:
Check the supplied screws and wall
plugs prior to use to ensure that these are suitable for
the strctural conditions on site.
1
Supply package = complete set
Items 2 - 9 are pre-assembled
1. Operator head including LED-module
2. Driving pinion
3. Track, operator side
4. Carriage
5. Toothed belt or chain
6. Deflection roller
7. Connector
8. Track, door side
9. Tensioner
10. Wall bracket
11. Door connector attachment
12. Linking bar
13. Central support
14. Bag of screws
15. Hand transmitter
16. Support straps
17. Telescopic fitting for sectional doors
(accessory)
2
Overview
3
Track
Assemble the track as shown in the images
Retain these installation, operating and maintenance instructions for the full duration of the operator's service life!
4
4
4
Fastening the track to operator head
Slot track (as illustrated) with chain sprocket ( ) onto
the operator shaft (
1a
self-tapping screws.
5
Fitting the connector attachment
5a
The enclosed door connector attachment is
suitable for all up-and-over doors and sectional
doors.
Position door connector attachment (
the top edge of the door leaf.
Mark fixing holes and drill using 4 mm metal drill
(max. Drilling depth 10 mm) or use the existing drill
holes. Screw on attachment using enclosed self-
tapping screws 6.3 x 16.
5b
For other sectional doors, use telescopic fitting
(
17
) (accessory).
6
Attaching the wall bracket
In order to ensure that the door can run freely
underneath the track, distance " " must be greater
than 20 mm. Choose distance " " so that the angle of
the linking bar does not exceed 45° (see figure
Mark the door's highest point of travel " " plus
distance " " on the lintel.
x
Hold wall fastening (
10
vertically over the door connector attachment drill,
drill holes for wall plugs and screw the wall bracket
onto the wall.
7
Suspending the boom from the ceiling
Attach central support (
connector ( ).
7
8
Support straps
Positioning the prefitted operator at an angle to the
door, screw to wall bracket (
making sure that it cannot fall down, and align in such
a way that the track runs horizontal and parallel
between the door tracks.
9
Establish the length of the support straps for the
operator head and the central support. If necessary,
shorten using a saw, and then screw in place.
Note:
Before starting any drilling, cover over track
and operator head to protect them from drilling dust.
Mark fixing points on the ceiling, drill 10 mm holes for
plugs and screw on support straps.
10
If the toothed belt or chain appear to be too slack,
slight retensioning may be required. It may be
necessary to take up the slack by adjusting the
support straps.
11
Connecting the door connector attachment
to the carriage
12
Place linking bar (
) between carriage ( ) and the
door connector attachment (
ends with the bolts. Provide bolts with security clips.
Attach security clips to bolts.
12
Disengaging the carriage
In order to carry out further work, it may be necessary
to disconnect the operator from the door by pulling
the pull cord on carriage ( ) and move the door
manually.
Note:
If the door is to be operated manually for a
longer period of time, then the locking pin must be
removed from parking position ( ) on the left and with
theopull cord in locking position ( ).
In order to relock, return the locking pin into the
3a 3b
-
.
parking position ( ) on the left and restore the
a
connection between the operator and the door. On
2
the next movement, the carriage automatically re-
) and screw down with the 4
engages.
Note:
11
) centrally on
13
F. Connection for external impulse generator
G.Input STOPA
x
x
11
).
a
H. Input STOP B
) at the total height (" " + " ")
a
x
O.LED-module
In case of increased need for personal safety, in
addition to the operator's internal force limit, we
13
) to track ( ) in front of the
8
recommend installing a one-way photocell. Further
information on our range of accessories can be
found in our sales literature. Consult your specialist
dealer.
10
). Lift up operator,
• Warning sticker
Place the sticker clearly visible on the inner surface
of the door.
1. Pull out the mains plug and disconnect all existing
2. Disconnect door and operator. Fix door.
3. Proceed according to points 3 to 13 of the
4
11
) and connect at both
4
a
b
13
Aligning the aerial / Connecting plan
It is essential to pull out the mains plug
before opening the cover!
Do not connect any live leads, only
potential-free buttons and potential-free
relay outputs. Finally, replace the cover and
screw down.
Before using the operator for the first
time, it must be tested to make sure that it
is working properly and safely (see
section on Maintenance/Checks).
(accessory, e. g. key switch or digital coder)
A break at this input end causes the operator to
stop or prevents it from starting up.
Connection for wicket door contact
(accessory)
Connection for 2-wire photocell EXTRA 626
(accessory).
Impulse generators and external safety devices
Dismantling the operator
terminals.
installaton Instructions but in reverse sequence.
GB
connect
13b
13c
13d

Publicidad

loading

Productos relacionados para Becker BOM 650C