Down rod, Canopy, Coupling
1) Select the right down rod depending on the height of your ceiling
2) If neither of the down rods fits, contact your fan distributor
3) Remove the locking pin, the two screws off the coupler.
4) Place the down rod through the canopy, and route the electrical cables through the extension.
5) Insert the extension into the coupler, insert the coupling screws and the pin, tighten the two screws on the coupler and close
with the cover
The fan must be mounted at least 2.30 meters above the floor.
Mounting the blades
1) Fix the blades to the motor with two screws.
2) Repeated the operation for each blade
Installation of the motor cover
Cover______
__
____________
__
___________ _
___
_
_____
_______ ________
____
___