Trial Operation - Invacare Aquatec Pure Bidet Manual Del Usuario

Ocultar thumbs Ver también para Aquatec Pure Bidet:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 139
Aquatec® Pure Bidet

4.3 Trial operation

Leakage test
A
1. Open the shut off valve A completely by turning
counterclockwise.
2. Check for any water leakage on the connection hoses,
tighten if necessary.
Connecting the power plug
1. Read and follow the safety information regarding
electrical safety, → 2.1 Safety information, page 6 .
2. Connect power plug to a suitable power source.
16
WARNING!
Electric shock hazard
– Do not turn over or move the unit after power
connection.
3. If the power indication light is not turned on after the
power plug connection, press any button except HI/LO,
FR/BK buttons of the remote control, then power goes
on.
Checking the key functions
B
C
A
1590625-D

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido