The redox value shows the oxidation/reduction potential and is used to determine the sterility of the water. Adjusting the ideal redox level (setpoint) is the last step in the
system start up sequence.
Redox control
redoX
Attention: Use only gold redox probes!
Optional Conductivity probe
Metering and control of the
conductivity of the water in μS
Conductivity probe
yellow
1
transparent
2
1000 TDS ≈ 1800 μS
110-230 V
POTENTIALFREIE KONTAKTE
max. 3.15 A
1 2 3 4 5 6
7 8 9
10 11 12 13 14
N
L
FILTER PUMP
Filtration control
A1 A2
7
&
8
14
11
12
Variable Speed Pump
1
slow
2
medium
3
fast
4
common
10.4 Redox Calibration
10.41
10.5 Conductivity calibration
10.51
10.52
10.54
1
2
11. VARIABLE SPEED PUMP
11.1
11.3
10.42
10.43
10.44
10.45
10.53
10.51
Recommended every month during usage season.
10.52 Calibration with buffer (buffer solution 1413 μS/
12880 μS/ neutro): Follow the instructions in 7 steps that
appear in the display (screen 4.24 corresponds to step 1).
10.55
10.54 Manual calibration:
Not recommended!
11.2
11.1 Variable Speed Pump: To install a Variable Speed Pump
contact your installer.
11.2 - 11.5 After connecting the pump, each filtration period
can be assigned a different speed
F: fast, M: medium and S: slow.
See chapter 12 - Filtration
11.4
11.5 Filter cleaning: To backwash the filter with a Variable
Speed Pump use the fastest speed.
See chaper 13 - automatic backwash
Please see the wiring schemata in the appendix!
5
10.41 Calibration of the redox probe:
Recommended at least every 2 to 3 months.
10.42 Calibration with buffer (buffer
solution 465 mV): Follow the instructions
that appear on the display
10.44 Manual calibration:
Not recommended!
Calibration
of
the
Conductivity
probe:
EN