Honeywell RABO Manual De Instrucciones página 24

Contadores de gas de pistones rotativos
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 91
Honeywell
The oil quantity is correct when the oil is visible in the threads of the oil-
level inspection borehole (Fig. 11 | No. 2) or in the centre of the inspection
window.
After filling, the plugs must be inserted again together with the O-ring and
tightened with a torque of 9 Nm.
Commissioning:
Slowly fill the system until the operating pressure is reached.
The pressure rise must not exceed 350 mbar/s.
A bypass line should be used for filling (recommendation:
12 mm pipe diameter).
Do not exceed the measuring range of the gas meter even briefly.
A tightness test must then be carried out.
24
730xxxxxe
© Elster GmbH | All rights reserved. Subject to modification

Publicidad

Tabla de contenido
loading

Tabla de contenido