4.1. CALIBRATION PROCESS
4.1.1.
Activate your power meter (follow instructions in section
3.1. of the user manual) and complete the following calibration
process in less than two minutes.
4.1.2.
With the bike upright and level with the ground, place the
left crank in the 6 o'clock position as shown in the picture. Make
sure to complete the calibration process with the pedals already
installed; do not place any weight on them until the process has
finished.
4.1.3.
First calibration: follow the specific instructions for your
ANT+™ device to send the "CALIBRATION" signal. You can
usually find the "CALIBRATION" button in the menu:
Settings\Bike settings\Bike profiles\"Your profile"\ANT+Power.
4.1.4.
The device must show a value of 1000 or a message of
successfull calibration. Turn the cranks counterclockwise at least
two turns at a moderate speed, returning again to a vertical
position with the left pedal down, making sure that the crank is
as perpendicular as possible to the ground for accurate angle
measurement.
4.1.5.
Second calibration: press again the "CALIBRATION" button.
The device then returns a calibration value between +/- 200.
There are some monitors in which a successfull calibration
message will be shown. The second calibration has finished and
the power meter is ready to use.
There's no need to calibrate your ROTOR INpower every time
you use your bike. It should be done when installing on the
bike for the first time, pedals are installed or switched, or when
swapping chainrings requiring the cranks to be disassembled.
It is recommended to repeat the calibration process after an
adjustment period of approximately 30 hours of riding.
For more information about the calibration process, user utilities
and training options, visit our website: www.power.rotorbike.com
Calibration / Zeroing
48