Descargar Imprimir esta página

Miele UO 8250 Instrucciones De Montaje página 27

Zócalo

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 24
Produktgruppen 522, 592
27 von 30
am
Parts required
Quantity
Mat. no.
1
07761970
or
1
07762000
or
1
07761950
or
1
07761990
Note
This service and repair work should only be carried out by a suitably qualified electrician (with specialist training, knowledge and
experience, and recent related work experience) in accordance with all appropriate local and national safety regulations.
Servicing, modification, testing and maintenance of electrical appliances should only be carried out in accordance with all appropriate
legal requirements, accident prevention regulations and valid standards. All regulations of the appropriate utility supply companies and
standards relating to safety (not limited to electrical safety) are to be complied with.
Note
Service and repair work on gas machines should only be carried out by suitably qualified persons in accordance with all appropriate local
and national safety regulations. Ensure that all special regulations applying to gas installations are also complied with.
Before starting any service work, the machine must be disconnected from the gas supply.
Danger!
Even with the machine switched off, voltage may be applied to some components.
Before starting any service work, the machine must be disconnected from the power supply. Suitable measurements must be made to
ensure that this is the case.
A general visual check should always be carried out.
Incorrect conversion or service work can be dangerous (risk of fire, electric shock, etc.).
Danger!
Correct grounding function can be deactivated if casing parts are incorrectly assembled.
Correct grounding function must be ensured when reassembling the casing.
Carry out appropriate electrical safety checks, including a visual check and a ground resistance check.
Danger!
During installation, all accessible conductive parts that are not connected to ground must not have any link to ground (strengthened
double insulation).
To confirm this, insulation resistance and touch current measurements must be carried out.
28.09.2010
Diese Unterlagen dürfen ohne unsere Genehmigung weder vervielfältigt noch Dritten zugänglich gemacht werden. Eigentumsrechte vorbehalten.
Umbau- und Montageanweisung
Designation
Stand kit UO 8250
Stand kit UO 8330
Stand kit UG 8250
Stand kit UG 8330
M.-Nr. 07946040

Publicidad

loading

Este manual también es adecuado para:

Uo 8330Ug 8250Ug 8330