Descargar Imprimir esta página

Lockncharge PCLOCK iQ Wall Cages Manual De Instrucciones Para El Usuario página 5

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 18
STEP 8. Adjusting the door pressure.
There are two screws on each hinge to adjust the tension on
the hinge – this prevents the doors slamming open. Use a 2mm
Allen key to tighten/loosen the screw – do not over-tighten.
STEP 9. Lock it all up.
Your devices are now safe and secure in the iQ Wall Cages.
For desk mounting.
Note: Desk mounting is not recommended because of permanent modification & damage to the desk.
No fixings are provided for desk mounting.
Open the door, remove the basket, and remove the drawer by releasing drawer runners.
There are four holes in the base of the iQ Wall Cage.
Locate the iQ Wall Cage on the desk where you intend it to sit, and mark the hole locations.
Remove the iQ Wall Cage and drill pilot holes.
Place the iQ Wall Cage back into position and insert screws in the four holes.
For wall mounting.
Note: The iQ Wall Cages are designed for installation on a solid concrete wall using M8 Dynabolts. For other
types of wall construction, you should seek verification on site by a qualified structural engineer as to the wall's
suitability and strength.
Customer needs to supply the following:
Safety glasses
Hearing protection
Spirit level
Hammer
Note: The fixing kit is supplied
STEP 1.
Using the supplied iQ8 Wall Mount Template, find a suitable
location where the wall cage will be mounted. Be aware that the
iQ8 Wall Cage will require a power point before finalising a location.
Using tape, stick the template to the wall.
INSTRUCTION MANUAL
Centre punch
Electric impact drill
10mm masonry bit
13mm socket with extension and rachet

Publicidad

loading