Testing Procedures; Pneumatic Hose Connection Check; Instructing The Operator - Hofmann monty 1270 Manual Del Operador

Tabla de contenido

Publicidad

62
iii-1
If the air pressure exceeds 12 bar (170 psi) it is
mandatory to install a pressure regulator before the
air inlet of the machine.
It is suggested that the air supply be equipped with a
water separator to reduce the amount of water at the
air inlet.
BEFORE CONNECTING THE MACHINE TO THE AIR
SUPPLY BE SURE THAT NOTHING IS LEFT ON THE
TURNTABLE AREA (TOOLS,ETC).
After ensuring all the above proceed as follows:
• Connect the machine to the air supply (max.
pressure of 12 bar (170 psi) with a rubber hose
(rated for the pressure) with an inside diameter of
6 mm (1/4") (Fig. iii-1).
• To install any accessory on request follow the
instructions enclosed with it.
• In case of installation of an air-filter and lubricator,
check correct functioning.
iv

Testing procedures

Pneumatic hose connection check

When fi rst setting the machine into operation, check
hose connections and unions for leakage.
v

Instructing the operator

(Following applies only if a unit is installed by a ser-
vice Technician)
• Show the operator how to switch the unit on and
off.
Operator Manual

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido