Purging Method:To use vacuum pump
1.
Remove the service port cap of the 3-way valve and the valve stem cap for both
valves. Connect the low pressure hose from the manifold set to the 3-way valve.
Connect the center hose to the vacuum pump.
2.
Open the handle on low side of manifold and
side gauge reaches a vacuum immediately, ensure the hoses are connected
properly and the low side manifold handle is open.
3.
Vacuum for a minimum of 15 minutes and check the gauge for a proper vacuum.
After the completion of vacuuming, close the handle 'Lo' in gaugemanifold and
stop the operation of the vacuum pump.
the vacuum level again in 1-2 minutes. If you lose the vacuum, ensure all
connections are tight and flare the tubes again if needed.
4.
Open the valve rod stem the 2-way valve counterclockwise to 90 degrees.
After 6 seconds, close the 2-way valve and inspect for gas leakage.
5.
No gas leakage?
In case of gas leakage, tighten parts of pipe connection. If leakage stops,
then proceed
step 6. If leak continues, remove the refrigerant used for the
leakage check and flare tubes again. Repeat vacuum and leak and if no
leakage, proceed to step 6.
6.
Detach the charge hose
from the service port, open 2-way valve and 3-way. Turn
the valve stem counterclockwise.
7 .
To prevent the gas leakage,
replace the service port and valve stem caps securely.
8.
After attaching each cap, check for gas leakage around the caps.
Step 1.
2-way valve Liquid Side
3-way valve Gas Side
Gaugemanifold(for R410A)
Anti countercurrent joint
Vacuum pump(for R410A)
Tube(for R410A)
Step 4.
2-way valve
3-way valve
O
Open 90
2-way valve 3-way valve
CAUTION
If the refrigerant of the air conditioner leaks, it is necessary to discharge all the
refrigerant. Vacuum first, then charge the liquid refrigerant into air conditioner
according to the amount marked on the name plate.
Please do not let other cooling medium, except specified one (R410A), or air
enter into the cooling circulation system. Otherwise, there will be abnormal
high pressure in the system casuing damage and possibly personal injuries.
Power Source Installation
The power source must be exclusively used for air conditioner. (Over I0A)
In the case of installing an air conditioner in a moist place, please install an ea-
rth leakage breaker (GFCI).
For installation in other places, use a circuit breaker as far as possible.
Cutting and Flaring Work of Piping
Pipe cutting is carried out with a pipe cutter and burs must be removed.
After inserting the flare nut, flaring work is carried out.
Flare tool for R410A
Clutch-type
clutch-type(Rigid-type) Wing-nut type (Imperial-type)
1.0~1.5mm
0~0.5mm
A
0~1/51 inch
3/76 ~1/17 inch
4
operate vacuum pump. If the low
Leave the hoses connected and check
Step 2.
Open
Step 3.
Close
Step 6.
2-way valve
3-way valve
2-way valve
Step 7.
3-way valve
Valve rod cap
Valve rod cap
Service port cap
Conventional flare tool
1.5~2.0mm
1/17 ~1/8 inch
1.Cut pipe
Flare tooling die
3.Insert the flare nut
Correct
Lean
Damage of flare Crack
On Drainage
Please install the drain hose so as to be downward slope without fail.
Please don't do the drainage as shown below.
It becomes
The end is imm-
It waves.
high midway.
ersed in water.
Please pour water in the drain pan of the indoor unit, and
is carried out surely to outdoor.
In case that the attached drain hose is in a room, please apply heat insulation to
it without fail.
Refrigerant charge label
Contains fluorinated greenhouse gases
covered by the Kyoto Protocol
R410A
1=
2
2=
1
1+2=
F
E
This product contains fluorinated greenhouse gases covered by
the Kyoto Protocol. Do not vent into the atmosphere.
Refrigerant type:R410A
GWP* value:1975
GWP=global warming potential
Please fill in with indelible ink,
• 1
the factory refrigerant charge of the product
• 2
the additional refrigerant amount charged in the field and
• 1+2 the total refrigerant charge
on the refrigerant charge label supplied with the product.
The filled out label must be adhered in the proximity of the product
charging port (e.g. onto the inside of the stop valve cover).
A contains fluorinated greenhouse gases covered by the Kyoto
Protocol
B factory refrigerant charge of the product: see unit name plate
C additional refrigerant amount charged in the field
D total refrigerant charge
E outdoor unit
F refrigerant cylinder and manifold for charging
Check for Installation and Test Run
Please kindly explain to our customers how to operate
through the instruction manual.
Check Items for Test Run
Put check mark
connecting
pipe
Gas leak from
?
Heat insulation of
connecting
pipe
Are the connecting wirings of indoor and outdoor firmly
inserted to the terminal block?
Is the connecting wiring of indoor and outdoor firmly fixed?
Is drainage securely carried out?
Is the ground wire securely connected?
Is the indoor unit securely fixed?
Is power source voltage abided by the code?
Is there any noise?
Is the lamp normally lighting?
Are cooling and heating (when in heat pump) performed normally?
Is the operation of room temperature regulator normal?
2.Remove burs
4.Flare pipe
Incorrect
Partial
Too outside
Less than
5cm
The gap with the
There is the bad
ground is too small
smell from a ditch
confirm that drainage
A
kg
B
kg
C
kg
D
in boxes
?

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Hsu12vhj

Tabla de contenido