Descargar Imprimir esta página

PRO LIFTS VMB HDT-8 Manual De Instrucciones página 5

Torre elevadora

Publicidad

Idiomas disponibles

Idiomas disponibles

CONTENTS
1. Introduction.
2. Technical information.
3. Safety precautions.
4. Operation.
5. Maintenance.
1. INTRODUCTION
Dear customer, in order to ensure a safe
and reliable operation of the HDT-8 tower-
lift please follow the instructions in this
read the instructions completely and plea-
se note the technical information contai-
ned within this manual.
All VMB products undergo very rigorous
testing, under strict conditions and they
are monitored continuously during the ma-
nufacturing process.
In order to guarantee the lifts function and
safety, only original parts from the manu-
facturer must be used. If any parts other
than those of the manufacturer are used,
user forfeits all warranty rights to claim.
VMB reserves the right to modify the pro-
The model type, production year and se-
rial number must be quoted in any queries
or orders for spare parts.
PRO LIFTS S.L.
ENGLISH
2. TECHNICAL INFORMATION
2.1 - HDT-8 Towerlift.
2.2 - Designed to lift loads, such as trus-
sing and lighting systems, vertically, up to
different heights.
2.3 -
2.4 - Minimum load: 25 Kg (55 lb).
2.5 - Security :
ALS
2.6 - Maximum height : 8.2 m (26.9').
2.7 - Folded height : 1.98 m (6.5').
2.8 - Transport surface:
0.72 x 0,56 x 1,98m (2.36 x 1.84 x 6.5')
2.9 - Shipping dimension:
0,74 x 0,58 x 2.00m (2.43 x 1.90 x 6.56')
2.10 -
2.11 x 2.57 m (7' x 8.4').
2.11 - Unit weight : 232 Kg (512 lb).
2.12. - Load support:
2.13 - Construction material : 6082-T6
alluminium for the main body, comprised
ding to DIN 2394. Catches and pulleys of
ST-37 steel.
2.14 - Winch: 1700 Kg. maximum load
Depósito legal y copyright. Todos los derechos reservados.
-
5

Publicidad

loading