NEO STEAM F1400 Manual De Usuario página 8

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

6. SET UP
1. Open the shipping carton and carefully remove
the unit from the shipping carton;
2. Be sure to remove packing material from around
the faze machine, especially near the nozzle;
3. Set the faze machine on a dry, flat surface;
4. Connect the quick connector with the liquid tank
cap (Figure 1-C). Be sure of well connection. Use
definitely water based liquid of good quality;
5. Plug mains power cord from the faze machine
into appropriate power supply socket. Wait
about 60 seconds for heating element to heat up;
6. Use LCD display for operating control, or con-
nect DMX controller for setting;
7. Moving the machine during operation could
probably get air entered into the liquid pipe and
affect smoothness of fog blasts. If this hap-
pened, press the start/stop button to fog for a
moment. Until the air is dispersed from the pipe,
the machine will recover its normal fogging.
P. 8
Neo Steam F1400 - English version

Publicidad

Tabla de contenido
loading

Tabla de contenido