Installation Of The Unit - Ferroli MERCURY SP - N 07 Manual De Instalación, Uso Y Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Models 07 a 23

Installation of the unit

The MERCURY-SPN units have only been designed for installation in a horizontal ceiling.
-
The positions of the battery plugs cannot be exchanged
-
Special attention must be given to the correct levelling of the unit, to ensure adequate collection and evacuation of condensed water
from both the main battery and the condensed water collection tray of the cross valve kit (optional).
-
Likewise, the horizontal route, with drop of the condensed water collection pipe, must be checked, to prevent overflowing of the tray.
The condensed water outlet pipe must never exceed the height of the condensate collection tray.
-
The external diameter of the outlet pipe is 19mm
-
The installation of a siphon at the outlet of the condensate tray is important.
-
The assembly of the unit with the accesories are shown in the next picture.
Technical characteristics
D
B
F
H
C
Model
A
B
C
07
290
1005
650
11
290
1005
650
13
319
1135
700
17
319
1135
700
19
360
1330
765
21
360
1330
765
23
360
1635
765
D
E
F
G
915
235
950
260
915
235
950
260
1000
260
950
260
1000
260
950
260
1200
300
1300
320
1200
300
1300
320
1200
300
1550
320
H
I
Uds.
1030
430
mm
1030
430
mm
1160
480
mm
1160
480
mm
1355
540
mm
1355
540
mm
1660
540
mm
105

Publicidad

Tabla de contenido
loading

Tabla de contenido