CICSA ZETA ZT 800x500 Manual De Instrucciones página 15

Secatoallas modelos zt, zx, pukita, tubon, dijon, cuadro, karnak, verona y elfie
Ocultar thumbs Ver también para ZETA ZT 800x500:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Dry-towel models ZT, ZX, PUKITA, TUBÓN, DIJON, CUADRO, KARNAK, VERONA and ELFIE
Step 3
Without tightening completely, adjust
the support rod (b) to the towel radiator
with the front of the support (c) and the
support screw (h). Turn the support rod
(b) according to the following figures:
Step 4
Align the support stem
(b), with the support
base (a) and place the
towel radiator in its
position.
Step 6
Insert the mini screw (i)
into the support base
(a) and tighten with a
screwdriver to fix the
bracket in the desired
position.
Step 8
Connect the electronic control to the electrical net. Your towel radiator is ready for operation.
SCHEME OF THE THERMOSTAT
1 - [+] Button
2 - Button [Prog].
3 - [On/stand-by] Button
4 - Button -
5 - Led screen (No retro-lightning).
A - Internal buzzer: For acoustic
warnings, compliant with EN60335-1
directive.
B - Water Protection: The IP44 protection
level is guaranteed by a special design of
the connection parts.
C - External sensor: Guarantees a stable
room temperature and a prompt reaction
in case of strong temperature variation.
Straight Radiator
Curved Radiator
Step 5
Tighten the support
screw (h) with a
screwdriver.
Step 7
Press and fit the trim (d)
in its position on the front
of the support (c).
1
2
3
4
B
C
English - User guide
TMU
5
A
15

Hide quick links:

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Zeta zt 1.200x500Zeta elfie 1.200x500

Tabla de contenido