Transport And Storage Conditions; Installation Of The Unit; Factory Settings; Initial Steps - 3M ESPE Elipar FreeLight 2 Instrucciones De Manejo

Potente fotopolimerizador inalámbrico led
Ocultar thumbs Ver también para Elipar FreeLight 2:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 34

Transport and Storage Conditions:

- Ambient temperature range -20°C to +40°C
- Relative humidity range of 10% to 80%, excluding
condensation
- Atmospheric pressure of 500 hPa to 1060 hPa
Subject to technical modification without prior notice.

Installation of the Unit

Factory Settings

The factory settings of the unit are as follows:
• "Standard" setting (constant light intensity)
• 20 sec exposure time

Initial Steps

Charger

Please ensure first that the voltage stated on the
rating plate corresponds to the existing main supply
voltage. The rating plate is attached to the bottom of
the unit.
Place the charging unit on a level surface.
- The vent slots on the bottom of the unit must not be
obstructed to protect the device from over-heating.
Connect the power cable of the charger to the power
supply.
- The green LED on the left side of the device is
illuminated. This shows that the unit is ready for
operation; please refer to the section,"LED Display
of the Charger".

Light Guide/Handpiece

Never insert the handpiece in the charger unless the
battery is inserted in the handpiece first!
Autoclave the light guide prior to first use.
Then insert the light guide in the handpiece until it
snaps into place.
Place the enclosed glare shield on the light guide.

Insert the battery:

Rotate the lid at the lower end of the handpiece
counterclockwise until it hits the stop, and then
remove the lid.
4
Push the battery into the handpiece as shown by the
arrow, until the battery snaps into place. This normally
requires clearly perceptible strength. The unit will
malfunction if the battery is not snapped into place.
Replace the lid and rotate clockwise until it locks into
place.

Battery Charging

In the event of malfunction, remove the rechargeable
battery from the device and re-insert as described
above.
Place the handpiece on the charger for approx.
12 hours before the first use, in order to charge the
new battery completely for the first time.
- The yellow LED of the charger illuminates after
approx. 2 sec; please see also section, "LED
Display of the Charger".
- Note: new batteries attain full capacity only after
several charging/discharging cycles. Therefore,
the battery charge may initially be sufficient for a
smaller number of exposures.

LED Display of the Charger

Yellow LED
Green LED
LED
LED
Acoustical
green yellow
Signal
On
Off
----
On
Off
----
On
On
----
On
Flashing ----
On
Flashing Ongoing
beeps
no handpiece
charger
inserted in
ready for
the charger
operation
handpiece
charging
inserted in
has been
the charger
completed
handpiece
recharge-
inserted in
able
the charger
battery is
being
charged
handpiece
recharge-
inserted in
able
the charger
battery is
defective
handpiece
charging
inserted in
contacts
the charger
are wet

Publicidad

Tabla de contenido
loading

Tabla de contenido