·
Replace the water reservoir in the casing. The water reservoir in the bottom will be filled automatically.
·
Place the plug of the adapter in the opening provided at the back of the appliance. Put the plug in the
socket.
OPERATION
·
Turn the appliance on with the on-off button. The air cooler works at speed I. The indicator light of
speed I is blue.
·
Press the on-off button a second time to increase the speed. The indicator light of speed II is blue as
well.
·
If you press the on-off button a third time, the appliance is switched off.
COOLING MEMBRANE
·
The cooling membrane should be replaced after 540 hours of operation.
·
The indicator light of the cooling membrane lights up read once these hours have passed.
·
Open the casing and position a new cooling membrane with the V-shaped openings facing up. Close
the casing.
·
Once the new membrane has been installed, press the cooling membrane's reset button.
www.domo-elektro.be
21
DO154A