Regular Maintenance; Technical Data - Stanley MasterFix XGrip N08QI Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

5.
Maintenance
Use safety goggles
Use hearing protection
Use safety gloves
5.1

Regular maintenance

Turn off and disconnect the air supply.
- Check the oil level. There may be insuffi cient oil if the stroke is too small for proper installation
of the rivet nut or rivet bolt.
- Dismantle anvil(see Fig. 2.1). then clean using an air blow gun and soft cloth.
- Dismantle the mandrel (see Fig. 2.4) clean using an air blow gun and soft cloth.
- Clean front sleeve using an air blow gun and soft cloth.
- Lubricate mandrel after reassembly.
5.2
Major maintenance
Every 100.000 cycles tool must be completely dismantled and all seals and worn parts must be replaced.
This must be done only by a trained engineer or listed service center.

6. Technical Data

Model
Weight
length
Height
Stroke
Pulling Force
Rivet nut range
nom. dia.
7.
Warranty
This rivet nut tool has a 12 month warranty from the day of delivery (to be proven by invoice
or delivery note). Damage caused by common wearing, overloading or improper handling are
excluded from the warranty. Damages caused by material or manufacturing faults will be covered
by this waranty and will be repaired or replaced at no cost. Claims can only be accepted if the
complete rivet nut tool (not stripped) is returned to the distributor.
XGrip N08QI - XGrip N10QI
XGrip N08QI
kg
mm
mm
mm
N
2,3
313
276
9 max
21000
M3-M8
4
XGrip N10QI
2,5
313
276
9 max
29800
M4-M10

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Masterfix xgrip n10qi

Tabla de contenido