Descargar Imprimir esta página

Snapper 1226 Manual De Operación página 34

Ocultar thumbs Ver también para 1226:

Publicidad

Idiomas disponibles

Idiomas disponibles

Adjustments & Service
NOTE: To assemble the auger housing to the frame,
have someone hold the auger clutch lever in the
ENGAGED position. This will move the idler arm and pul-
ley enough to allow the auger drive pulley to move back
into position.
13.Assemble the auger housing (C, Figure 48) to the
frame with the four upper capscrews (A) that were
removed in Step 10. Tighten the 2 lower capscrews
(B).
14. Index or point the spout rotator to the center of the
machine so the rotator control is in the center of the
dash panel.
15. Install small carriage bolts (A, Figure 48) and cap-
screws (B) and tighten with 7/16 wrench.
16. Install the auger drive belt (D, Figure 47) onto the
impeller pulley (H).
17. Slip the auger drive belt (D) under the auger idler pul-
ley (K).
18. Adjust the auger drive belt. See "How To Adjust The
Auger Drive Belt" in the Service section.
19.Adjust the belt guide. See "How To Adjust The Belt
Guide" in the Service section.
20. Install the belt cover (A, Figure 41). Tighten screws
(B).
21. Check the adjustment of the cables. See "How To
Check And Adjust The Cables" in the Adjustment
section.
22. Install the bottom panel (B, Figure 45).
23. Tighten the capscrews (A) on each side of the bottom
panel (B).
Frame and Axle Housing
Figure 48
35

Publicidad

loading

Este manual también es adecuado para:

1428