2.
Connect earth cable to the Power-
box - pole).
3.
Check coolant level of the SWK.
Note:
Refer to separate instructions
supplied with the device.
4.
Connect the welding gun to the
SDV's Euro connector socket.
5.
Connect coolant hoses according to
their colour coding.
6.
Install electrode wire spool:
− Open SDV cover.
− Remove the arbor cap from the
spool carrier arbor and place the
electrode wire spool on the spool
carrier arbor.
− The driving pin (35) must fit into
the wire roll's driving hole.
− Put the arbor cap back on.
Check setting of brake, correct
with screw (36) if necessary. The
brake prevents post-running of
the wire roll when the welding
process stops.
6.3
Threading the electrode
wire in
1,0/1,2 mm oder 0,6/0,8 mm.The feed
rolls are grooved for 1.0/1.2 mm or 0.6/
0.8 mm wire diameter. In operation the
electrode wire runs through the rear
groove (on the motor side). The wire
feed drive is factory-set for 1.0 mm elec-
trode wire.
If 1.2 mm electrode wire is to be used
the feed rolls must be reversed, for 0.6/
0.8 mm electrode wire the correspond-
ing feed rolls must be fitted.
1
2
3
4
5
1.
Swing handles outwards. The pres-
sure roll brackets will swing up.
2.
Check position of the feed rolls,
reverse rolls if necessary:
35
36
− Loosen retaining screws (37).
− Pull the feed rolls (38), complete
with gearwheels, off the floating
axles.
− Lift the feed roll off the gearwheel
and put it back on in a reversed
position, or replace with a feed
roll of appropriate groove size.
− Put both parts back onto the
floating axle and secure with the
retaining screw.
3.
Deburr the electrode wire and run it
− through the spiral guide,
− over the rear feed roll,
− through the guide tube,
− over the front feed roll
− into the Euro connector socket.
4.
Close pressure roll brackets and
swing handles up.
Set the contact pressure of the front
feed roll a little higher than that of
the rear feed roll.
5.
Remove gas shroud and contact tip
from the welding gun's swan neck.
1
2
39
3
4
5
6.
Switch all devices ON keep the wire
thread-in button on the SDV (39)
pressed down, until the electrode
wire projects approx. 2 cm at the
swan neck.
7.
Replace contact tip and gas shroud.
8.
Close the SDV cover.
ENGLISH
38
37
1
2
3
4
5
1
2
3
4
5
15