red lion 6RLPG-2K Manual Del Usuario página 2

Bomba motorizada de transferencia de aluminio
Ocultar thumbs Ver también para 6RLPG-2K:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

CAUTION:
DO NOT RUN THE PUMP BEFORE PRIMING IT. THE SEAL AND IMPELLER COULD BE PERMANENTLY DAMAGED.
a)
PREPARING THE ENGINE: Follow the engine manufacturer's
instructions before operating.
b)
PRIMING THE PUMP: Remove the priming plug, fill the casing
with water until full, and replace the plug. If the pump is below
the level of the water that will be pumped (flooded suction), the
pump will automatically fill up when the valves are open.
CAUTION: DO NOT OPERATE THIS PUMP DRY!
c)
START-UP: Start the pump. In a flooded suction situation, the
pump will discharge the water almost immediately. If the suction
Discharge
head
Typical water pump
Group
A
Bracket Kit
B
Seal Kit
C
Impeller Kit
D
Volute
E
Check Valve
F
Plug Kit
G
Casing Kit
H
Base Kit
FIG. 1
FIG. 2
Replacement Parts
Description
Components
1,2,3,4
5,6,7,8,9
10,11,12,13
14,15
16
18,19,21,22
17,20
23,24,25,26
OPERATION
line is above the water level being pumped, it will take a few
minutes to lift the water to the casing and then to discharge it. If
the suction line is quite long, the pump may overheat before the
water in the suction line reaches the pump. In this case, turn the
pump off and drain the casing. Wait a few minutes for the seal
in the pump casing to cool down. CAUTION: If the overheated
casing is filled while hot, damage to the seal will occur. Replace
the drain plug and refill the casing with water. Replace the priming
plug and restart the pump.
Total head
Suction head
25 ft. (8 m) max
Part Number UPC Code
617150
0 10121 14421 7
617151
0 10121 14422 4
617152
0 10121 14423 1
617153
0 10121 14424 8
617154
0 10121 14425 5
617155
0 10121 14426 2
617156
0 10121 14427 9
617157
0 10121 14428 6
2

Publicidad

Tabla de contenido
loading

Tabla de contenido