Battery Installation & Usage - TXED BIKE E-FOLDING XV Instrucciones De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Checklist before Riding
3.1.1 Please ensure tyres are fully inflated as indicated on the tyre wall, before riding.
Remember, performance of the bike is directly related to the weight of the rider and baggage/load, together
with the stored energy in the battery;
3.1.2 Charge overnight, prior to riding the next day;
3.1.3 Apply chain oil periodically and clean if dirty or gummed up,using a degreaser, then wipe clean oil
bicycle chain again.
4. Battery Installation & Usage.
The electric bikes have the battery positioned within the rear carrier (the battery pack is directly connected to
the controller box in the front.(fig 2)
The slider of battery is fixed on carrier by bottom screws (Fig 2.1).
Then the battery case is locked by the key (fig3 & 4) see the operation details below.
(Fig.2)
(Fig 2.1)
8/85

Publicidad

Tabla de contenido
loading

Productos relacionados para TXED BIKE E-FOLDING XV

Este manual también es adecuado para:

E-2000

Tabla de contenido