Installing The Band Clamps; Installing The Back - Invacare Matrx MX1 Manual De Usuario

Ocultar thumbs Ver también para Matrx MX1:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 60
4 DUAL MOUNT
4.6

Installing the Band Clamps

1.
Install the two band clamps A onto the back canes B of the
wheelchair.
Allow the band clamps to rest on the rigidizer bar C.
4.7

Installing the Back

1.
Align and insert the tabs A on the band clamp B with the slots C
in the clamp body D.
2.
Ensure the band clamp is fully inserted into the clamp body.
D
A
C
Invacare® Matrx® MX1
B
C
A
B
3.
Loosen the compression bar hardware E, so the clamp body rests
flush against the back cane.
4.
Insert the two locking pins F into the clamp body to lock the band
clamp in position.
The pins should slide into position with little effort. If the
pins are difficult to insert, verify that the band clamp is
properly centered and fully seated inside the slots G of
the clamp body.
5.
Ensure both locking pins are fully inserted.
\
E
6.
Tighten the compression bar hardware E to hold the locking pins
F in place. Do not fully tighten the hardware at this time.
16
G
F
F
E
Part No. 1176090

Publicidad

Tabla de contenido
loading

Tabla de contenido