Putting Into Service
Preparation for Use (continued)
PART NUMBER
Enerpac
®
Part Number
Volume
Viscosity
•
IMPORTANT - Add oil only when the placing tool piston is in the fully forward position or the system will
contain more oil than the reservoir can hold.
•
Ensure that the mains power supply to the pump unit is turned 'Off'.
IMPORTANT – BEFORE PUTTING THE TOOL AND HOSE ASSEMBLY INTO SERVICE:
•
ENSURE THAT THE PUMP PRESSURE RELIEF VALVES HAVE BEEN SET IN ACCORDANCE WITH THE
INSTRUCTION ON PAGES 18 TO 20 AND THE MAXIMUM PRESSURES SPECIFIED FOR THE PLACING
TOOL AND HOSES.
•
ENSURE THAT BOTH ITEMS ARE PRIMED WITH HYDRAULIC FLUID IN ACCORDANCE WITH THE
PROCEDURE IN THE PLACING TOOL INSTRUCTION MANUAL AND THE INSTRUCTIONS ON PAGE 20.
•
Connect the hydraulic hose quick couplers to the pump unit before connecting the electrical control cable.
Hoses and control cable must be connected in this order and disconnected in reverse order.
•
Switch on the mains supply to the hydraulic pump unit. Wait 5 seconds for the pump unit to complete the boot
sequence, before pressing the trigger switch. When all set the LCD screen on the pump unit will display
'AVDEL' and '0 bar'.
•
During the boot sequence the pump control system identifies any trigger operation as a potential malfunction
and prevents the motor from starting. The LCD screen will display 'BUTTON FAULT' in this instance. Reset by
switching off the power supply for 10 seconds.
•
Depress and release the placing tool trigger switch a few times to almost the full stroke of the tool to circulate
hydraulic fluid.
•
Observe action of tool. Check for fluid leaks and ensure that in the idler mode the piston is in the fully forward
position.
12
HYDRAULIC OIL
07992-00081
HF-95X
1 Litre
32 mm
2
/s
07992-00082
HF-95Y
5 Litres
32 mm
2
/s
07992-00083
HF-95T
20 Litres
32 mm
2
/s