Maintenance; Installing Or Removing The Lid/Strainer Basket - BADU Eco Touch-pro Ficha De Montaje, Uso Y Mantenimiento

Ocultar thumbs Ver también para Eco Touch-pro:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 238
Pos : 100 /Tec hnisc he D okumentati on/Betri ebs anleitung/Wartung/Ins tandhaltung/allgemeine Anl eitung Wartung/Instandhaltung @ 1\mod_1428480782431_370.doc x @ 27443 @ 1 @ 1
8

Maintenance

N O T IC E
Before maintenance work, close all shut-off valves and drain
all pipes.
All pumps
When?
Regularly
If there is a chance of
frost
Additionally for pumps with plastic lanterns (AK version)
When?
Regularly
Prior to longer idle
periods
After completing all maintenance work, perform all necessary
measures for start-up. See chapter 6 on page 21.
Pos : 101 /Tec hnisc he D okumentati on/Betri ebs anleitung/Wartung/Ins tandhaltung/allgemeine Anl eitungDec kel /Saugsi eb demonti eren beziehungs weise montier en @ 1\mod_1428483024842_370.doc x @ 27458 @ 2 @ 1
8.1

Installing or removing the lid/strainer basket

Any lids and strainer baskets must be removed for work to be
performed. See 8.1 in the associated pump data sheet.
Pos : 102 /Tec hnisc he D okumentati on/Allgemeine M odul e/#### Seitenumbruc h #### @ 0\mod_1426069111812_0.doc x @ 891 @ @ 1
10|2015
What?
Clean strainer basket.
Drain pump and pipes sensitive
to frost before temperatures
drop below freezing.
What?
Remove salt crystals caused by
the salt water. See chapter 8.3
on page 27.
Rinse the pump with tap water
to prevent crystals from forming
on the mechanical seal.
Maintenance
EN 25

Publicidad

Tabla de contenido
loading

Tabla de contenido