Maintenance; Dismantling; Disposal - OBO Bettermann EX BES Serie Instrucciones De Montaje

Abrazadera de puesta a tierra con fleje para zonas
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Maintenance

5
6
Note!
7
30 |EN
Maintenance
When used as lightning protection equipotential bonding, maintenance
work according to VDE 0185-305 (IEC/EN 62305) is required.
– Visual inspection: Annually
– Comprehensive test: Every 2 years
In addition, national laws and standards may contain additional main-
tenance instructions, which must also be observed.

Dismantling

1. Remove the strip earthing clamp from the pipe.
2. Replace the corrosion protection at the contact surface of the pipe.
Do not reuse the strip earthing clamp after dismantling

Disposal

– Metallic parts as scrap metal
– Plastic parts as domestic waste
Comply with the local waste disposal regulations.
.
OBO Bettermann

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ex bes 28Ex bes 300Ex bes 5005057 6305057 6405057 645

Tabla de contenido