Start-Up; Functions; Control Panel - Grundfos MQ Instrucciones De Instalación Y Funcionamiento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

8.5 Start-up

Before start-up, the pump must be filled with 1.2 to
1.5 gallons of water to enable it to self-prime,
see fig. 14. The pump is self-priming with a
maximum suction lift of 25 ft.
Fig. 14 Priming the pump
When started, the pump begins to self-prime.
When it has been primed, the pump will
automatically change over to normal operation.
If the priming has not been completed within
5 minutes, the pump will stop automatically and
attempt to restart after 30 minutes. It is possible to
reset the pump manually, see point 2 in the table of
section 9.1 Control panel.

9. Functions

9.1 Control panel

The MQ pump is operated entirely by means of the
control panel. See fig. 1. The control panel offers the
possibility of starting/stopping the pump. The pump
settings and operating condition are indicated by
indicator lights. See fig. 15.
Fig. 15 Control panel
11

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido