Unpacking And Inspection Of The Scope Of Delivery; Installation - Dometic MCS T6 Instrucciones De Montaje

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 80
MCS T6, MCS T12, MCS T16
7
Unpacking and inspection of the scope of
delivery
➤ Check all items against the packing list to ensure all cartons have been
received.
➤ Move units in the normal "up" orientation as indicated by the arrows on each
carton.
➤ Examine cartons for shipping damage, removing the units from the cartons if
necessary.
➤ If the unit is damaged, the carrier should make the proper notation on the
delivery receipt acknowledging the damage.
8

Installation

!
CAUTION! Danger of injury
The system may only be installed by qualified personnel from a specialist com-
pany. The following information is intended for technicians who are familiar
with the guidelines and safety precautions to be applied.
Plan all connections which must be made including
– ducting,
– condensate drain,
– seawater in and out,
– electrical power connections,
– location of control,
– seawater pump placement,
to assure easy access for routing and servicing.
I
NOTE
Review the following notes prior to and after installation.
EN

Unpacking and inspection of the scope of delivery

17

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Mcs t12Mcs t16

Tabla de contenido