3.3.1.2 Installing on Gates with Rack
1). Dig the founda�ons based on "Prepara�on for Motor Installa�on" and please no�ce the distances indicated in Figure 12.
2). Lay the conduits for the power cables and leave 30-50 cm longer as Figure 24.
3). Fit the two bent bins (as below "A"part in Figure 25) into the founda�on and fix them above and below with two nuts (as
the "B" part in Figure 25); make sure the outstanding part does not exceed the maximum height 25~35 mm as Figure 25.
4). Put the founda�on plate and make sure the gate keeping the distances shown as Figure 12.
5). Fit the conduits through the hole of the founda�on plate.
6). Pour the concrete.
7). Sink the plate into the concrete and make sure it is parallel to the leaf as below Figure 26.
8). A�er the concrete is dry enough, remove the two upper nuts (which will no longer be used) form the plate and cut the
cable conduits above the plate if the conduits are too long.
9). Open the cap by the rear of the gearmotor as shown in Figure 27.
10). Put the gearmotor onto the plate and underneath the rack. This step of
installa�on can be operated by �l�ng the gearmotor so that the pinion can
be
easily under the rack. Make sure the gearmotor lies ideally parallel with
the gate. Then fix it by fastening the two nuts and washers. (as the "C" & "D"
parts in Figure 28).
11). If necessary, adjust the height of the gearmotor (Max. 10mm) with the 4
dowels. It is be�er to fix the gearmotor without dowels as it is fastened
firmly and securely on the plate.