d
ogo
1224
3.3.5 PPB-1 Push Bu�on
1). PPB-1 push bu�on is installed indoors at the height of about 100cm, so that it could be used by most people.
2). Remove the round cover (A) by prizing it out with a screwdriver. See Figure 3.3.5 (1).
3). Unscrew the two screws beside the bu�on.
4). Separate the upper shell with the bo�om. See Figure 3.3.5 (2).
5). Breach the three holes at the bo�om and mark the points by the holes as reference.
6). Drill the holes in the wall and fix the bo�om to the wall by three screws. See Figure 3.3.5 (3).
3.4 Power Supply Connec�ons
Please kindly no�ce that the opera�on of power connec�on should be carried out by a qualified electrician with following
steps:
1). Make sure the gearmotor is not connected to the power supply before the installa�on is done.
2). Make sure all the wires are firmly connected.
3). Supply the gearmotor with the power.
4) Final Checks and Start Up
4.1 Ini�al Checks
4.1.1 Design of Dogo 1224 control unit
If the Led display is in normal performing
refer to "4.2.1", you can control the gate by
either transmi�ers or the bu�on on the
board: "UP"-clockwise moving, "SET"- stop
and "DOWN"- Counterclockwise moving.
www.accessmatic.com
Opening your life
14