OHAUS VF Serie Manual De Instrucciones página 11

Ocultar thumbs Ver también para VF Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

VF Series Floor Scales
Note: The following tests must be performed after a load cell has been replaced:
Check side load and adjust as needed
Calibrate with maximum load
9.4
Replacing Levelling Feet
1)
Stand scale up
2)
Unhook retaining springs from the defective foot and remove it
3)
Lubricate new foot with O-ring and insert into the load cells
4)
Hook retaining springs into the new foot
EN-9

Publicidad

Tabla de contenido
loading

Tabla de contenido