Installations Requirements - Hofmann monty 3300 Manual De Operador

Tabla de contenido

Publicidad

58
monty 3300 / 3300AIR
i-1
i. Installation requirements.
THE INSTALLATION SHALL BE CARRIED OUT ONLY
BY QUALIFIED PERSONNEL AND WITHIN THE
SCOPE OF THE INSTRUCTIONS PROVIDED IN
THIS MANUAL.
Install the machine in a covered and dry area.
The installation of the machine requires a free space of
at least 270x270cm (106"x106") (Fig.i-1).
Make sure that from the operating position the user
can see all of the machine and the surrounding area.
The operator shall forbid, in such an area, the presence
of non authorized persons and of objects which may
create possible hazards.
The machine shall be installed on a horizontal floor
preferably even. Do not install the machine on a sinking
or irregular floor.
If the machine is installed on a raised floor, the floor
must have a capacity of at least 5000 N/m² (500kg/
m² or 110lbs
sqft). The machine must be secured to
x
1125.tif
the floor through the holes provided in the cabinet.
Expansion screws 12x120mm shall be used.
Drill 12mm holes in the floor flush with the holes provided
in the cabinet.
Place the nogs into the holes drilled in the floor and
move the machine so that the holes of the cabinet are
flush with the holes in the floor. Tighten the screws at
70 Nm (51 ft
lb).
x
Operator's Manual
USA - CANADA

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Monty 3300 air

Tabla de contenido