Descargar Imprimir esta página

Nordcap GIOVE Serie Instrucciones De Uso página 18

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

6. Fasten the intermediate shelf by screwing it under the working shelf to the inside front of the basin (Ref. 5). To do
this, remove the bottom shelves close to the multiplex connections.
7. Fasten the canopy supporting bracket to the multiplexing shelf using the existing holes (Ref. 6).
8. Insert four M4x20 screws in the holes drilled under the canopies. Slide the central support of the change dish
underneath one of the canopies. Bring the two canopies together and bolt them to the bracket mounted previously
using the M4 screws just inserted (Ref. 6).
9. Slide the central support of the change dish to the center of the multiplexing.
Complete assembly of the cabinet as described in Par. 5 (FIG. 9-10-11-12 page 3).
18 - Wiring diagrams
The diagram can be seen on page 7
Legend:
AP = Output 230V
CA = Main power supply cable
CE = Electronic control
CS = Connecting cable
D = Defrosting heating element (Optional)
IG = Main switch
IL = Light switch
K1, K2, K3 = Relay
L = Phase
LV = Display case lights
M = Motor
N = Neuter
PC = Control panel
QE = Control board
SS = Defrost probe
ST = Temperature probe
Vm = Fan motor
Vv = Display case fan
19 - Instructions for the defrosts synchronization of multiplexed cabinets with instrument EVZ000
Please refer to the explanation at page 8. The connecting cable is supplied in the multiplexing kit.
20 - Conformity Declaration
A copy of the declaration of product conformity can be requested by filling in the form available a the internet address:
http://www.oscartielle.it/conformity
19

Publicidad

loading