FLEX POWER II
PIPE ASSEMBLY
Connect the relay excitation cable to the power
14
unit and connect to (+) under the ignition key or
to (+) started-up motor, leaving it at the required
length, always using the supplied terminals.
Caution: pass through along with the original
pipes or cables, avoiding any sharp areas and
constrictions, and secure with cable ties.
14
PIPING AND CABLE CONNECTION
Connect pressure gauges to the circuit.
1
Vacuum deair for 30 minutes. Introduce the oil
in accordance with the table. Introduce the gas
in accordance with the table.
Total pipe length
6 m
7 m
8 m
9 m
10 m
11 m
12 m
13 m
14 m
15 m
16 m
17 m
14
14
TABLE
C.C. Oil to be
introduced
20 c.c.
35 c.c.
50 c.c.
65 c.c.
80 c.c.
95 c.c.
110 c.c.
120 c.c.
135 c.c.
150 c.c.
165 c.c.
180 c.c.
35
14
Gas load to be
introduced
450 grs.
500 grs.
550 grs.
600 grs.
650 grs.
EN