REVOLUTION
EN
RECOMMENDATIONS
FOR ASSEMBLY
•Before starting the assembly read the instructions
and follow them during the installation process.
• Use suitable tools for each operation.
ELECTRICITY
• Switch off the ignition key.
• Disconnect the battery before starting the
assembly.
• Secure the connection of the electrical compo-
Secure the connection of the electrical compo-
nents by checking that they fit correctly.
WARNING :
When installing the air conditioning equipment on
the roof, the top part of the cab must be protected
with a cloth or blanket to avoid possible scratching.
When installing the Bycool Flat on the roof bear
in mind that cabins which are fitted with a hatch,
normally have a strong enough frame to withstand
the weight of the equipment. However, when this is
not the case and a cut needs to be made in the roof or
in the case of a hatch on the roof where the material
is not strong enough (in the case of a fibre, plastic
roof etc...) it will be the sole responsibility of the
installer to decide to reinforce the roof to avoid
possible deformations, breakages, leaks, etc... and
to provide the necessary measures to ensures do not
occur.
Torque Wrench set
Allen Wrench Set
Spanner 10
Spanner 13
Spanner 14
Scissors
Tape Measure
DOCUMENTATION WHICH COMES
WITH THE EQUIPMENT:
• Assembly Instructions: 220.AA8.ADR1
• User Manual: 220.AA8.0005
• Troubleshooting: 220.AA8.0004
• Included parts: 220.RE0.0102
• Guarantee: 220.AA1.0010
WARNINGS :
• Dirna, s.a. will not be held responsible for any
faults arising from inappropriate handling or
installation of the equipment, or due to modifications
or replacements carried out without our written
authorisation.
• See guarantee procedure for the product included
in Troubleshooting.
• See the equipment User Manual for the correct
operation of the remote control and the control
panel.
22
dirna
Tools
, s.a.