Dirna bycool REVOLUTION Instrucciones De Montaje página 37

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

REVOLUTION
Then connect the pump pipe (x) to the tank
24
and fasten tank (choosing the best position
for the filling plug, right or left, to enable
this) with supports supplied. The support
with the projection is placed, if the tank is
assembled with the filling plug, (Y) to the
left-hand side.
24
Assemble the filter in the pipe with a bolt,
25
insert into the filler plug and connect to the
return pipe Ø18 x Ø12 (A).
X
A
37
dirna
24
24
, s.a.
EN
Y
A

Publicidad

Tabla de contenido
loading

Tabla de contenido