COMPACT 3.0
EN
13
Fasten supports tightening nuts until outside
EPDM joint of equipment is compressed, between
3 and 6 mm;
Important: To avoid water from filtering inside
cabin, check EPDM joint tightening with unit base,
as indicated on diagram.
3-6mm.
Cabin roof
Fasten selflocked nut until
13
EPDM gasket is compressed
between 3 and 6 mm.
14
Tighten (4) M8 nuts to support and (4) to Unit
base.
15
Place console using (4) M6/100x15 allen head
screws bolts.
EPDM gasket
10 mm*
(*) (approx. after tightenin
Base
Bracket
28
Check compression
thickness using a
tape measure in the
four corners.
EPDM gasket
®
13
14
15