Descargar Imprimir esta página

S&P PULSE 160 Manual De Instrucciones página 15

Ocultar thumbs Ver también para PULSE 160:

Publicidad

Idiomas disponibles

Idiomas disponibles

Hazard symbol
Caution
Electricity
Warning symbol
Please note
2. SYSTEM OVERVIEW
2.1. FUNCTIONING
Wherever possible, PULSE 160 should be operated
in pairs; with one unit blowing in fresh air and the
other expelling spent air. The units change direc-
tion concurrently after 50-70 seconds (depending
on the selected fan speed). This allows a room to
be properly aired, balancing air infl ow and outfl ow
in accordance with DIN 1946-6. The integrated
heat exchanger extracts and stores heat from the
outfl owing air. When the direction changes and
fresh air is sucked in, it is warmed by fl owing over
the heat exchanger. The heat recovery rate can re-
ach 90%.
Example of optimal ventilation
This hazard symbol
warns about the
danger of injury.
This hazard symbol
warns about
the danger of
electrocution.
This warning symbol
indicates important
information.
Example for wet rooms
To ensure proper ventilation throug-
hout a building (i.E. Not just in one
room) it is important to foresee fur-
ther suitable ventilation vents, for
instance space under doors (ca. 15-20
mm) or the use of ventilation grilles.
Generally speaking, wet rooms
require two units to be installed.
This system is not suitable for wet
rooms with no outside wall (2).
Precautions to be taken that wet
room air does not mix with the air of
other rooms.
3. INSTALLATION PREPARATIONS
Before starting installation, please check that all
components are present, as otherwise it will not
be possible to complete the installation.
3.1. CONTENTS
(1)
15 15

Publicidad

loading