4. Prepare vertical panels for assembly.
4.1. Identify each panel's position
4.2. Remove protection film.
4.3. Insert the door's key in the keyhole to the exterior of the cold room.
4.4. Stick the adhesive tape on 1.5 cm from the bottom of the panels (When we remove the
tape after completing assembly, this will allow us to attach the rubber strip in the correct
position, facing upwards).
5. Set all panels.
5.1. Start from the corner on the least accesible side.
5.2. Begin placing each panel from the left to the right hand side.
5.3. When the celling panel is already assembled, the door can be placed.
5.2
5.1
4.2
5.3
Adhesive Tape
4.4
1,5cm
EN