4. Prepare for the panels assembly.
4.1. Identifiy each panel's position.
4.2. Remove protection film.
4.3. Insert the door's key in the keyhole to the exterior of the cold room.
5. Set all vertical panels.
5.1. Start from the corner on the least accesible side.
5.2. Start placing each wall panel, from the left to the right hand side.
5.3. Set up the roof panels.
5.4. When the roof panel is assembled, the wall panel with the door frame can be placed.
5.3
5.2
6. Finish and accessories.
6.1. Place a polythene foam plug in each hole in the floor.
6.2. Place the roof caps, walls and floor from inside the mini cold room.
6.3. Install the coving section, foot panel and any other accesories (Optional).
Polythene Foam
(Only for floor)
Finishes
The best finishes guarantee quality and robustness as they are made in a modern plant meeting the most
strict European standards. The vertical and the roof panels are finished in galvanised steel with epoxy paint
food safe certified.
5.1
6.1
Plastic Cap Brown and Grey,
(Depending on the floor type)
4.2
5.4
Coving Section
6.2
4.3
White Plastic Cap
Skirting
EN