ENGLISH
9.5
Cleaning the level probe
9.6
Planned maintenance
Use exclusively original spare parts
Description
Replacement of the
peristaltic pump hose.
Drying fan check
Tank filter
Detergent cap gasket
Lid gasket
Maintenance and repair operations shall be carried out after unplugging the machine
from power supply.
A correct maintenance of the device ensures its correct functioning as well as time and
service cost saving.
20
Check periodically (every 2-3 cycles) the
PROBE J - Y
J - Y
Clean the metal with products suitable for
stainless steel or a stripper.
Use a sponge (slightly abrasive).
Interval
Yearly
Yearly
Whenever necessary
Whenever necessary
Whenever necessary
Operator
Authorized technicians
Authorized technicians
User
User
Authorized technicians