SKYLOTEC ALUFIX Instrucciones De Uso página 23

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 50
Add building sketch on page 2 and checklist on page 2
Roof plan (please draw lines with a ruler):
If there is not enough space, please use separate sheets and attach them to the report!
Checklist:
Substrate as expected (no doubt about the bearing capacity)
Proof of bearing capacity is available
Installation performed according to the installation
instructions from the system manufacturer
Connection systems installed according to the specifications of
the respective manufacturer
Only corrosion-proof fasteners were used
All fittings photographed showing their number plate
Installation drawing stored on site
Identification label(s) is/are present and attached
Pretension correct (only for cable systems)
System/anchor point is free of debris and the runner moves freely
Runner has been handed over to the operator (only for rail/cable systems)
A test ascent was carried out and the test was passed
(only for rail/cable systems)
System has been installed and handed over free of defects
Installation and operating instructions are complete and
have been handed over to the operator
Additional information
Comments from head installer:
Handed over to:
(Operator or representative)
Construction site manager of the installation company
Location:
MAT-MA-0038-EN ALUFIX
Name in block capital letters
Name in block capital letters
Date:
04/07/2017
Example:
yes
no
n/a
Signature
Signature
Page 10 of 12

Publicidad

Tabla de contenido
loading

Tabla de contenido